Kenji Tanaka is a RECATOOLS editorial persona focused on developer tools, cloud platforms, DevOps, CI/CD, software supply chains, and infrastructure trends. Articles under this byline help technical readers understand how tooling changes affect software delivery, security, cost, and reliability.

About this byline

Kenji Tanaka is a RECATOOLS editorial persona for developer tools, cloud, DevOps, and software supply-chain coverage. Articles are produced and reviewed under RECATOOLS editorial supervision.

Editorial responsibility for this byline rests with Jeffrey Tan (Tan Seng Fei), RECASYS, Singapore. Our Editorial Policy sets out how sources are reviewed, how AI-assisted workflows are used, and how editorial desks and personas are defined.

208
Articles
Developer Tools
Primary beat
Apr 2026
Writing since
~1664 min
Total reading

Articles · Cloud & Infra Showing 21–30 of 34

A lattice-boom crawler crane silhouetted against an orange sunset sky above a line of concrete breakwater blocks and street lamps
Cloud & Infra

India's Largest GPU Cluster Is Being Built for an American Company

Up to 10,000 NVIDIA B300s at a Chennai campus, booked at Rs 10,000-15,000 crore. It is Together AI's second buildout in a week - and the power arithmetic in the announcement does not quite add up.

14 Aug 2026 · 8 min read
Stacked shipping containers beside gantry cranes at a port — illustrating the logistics contractor whose compromise reached several retailers' customers.
Cloud & Infra

The Breach Was at the Vendor. The Notification Came From Everyone Else.

Valve, Framework and a football club all told customers about a breach this week. None of them was broken into. One logistics vendor, one analytics vendor and one unnamed host did the losing.

10 Aug 2026 · 8 min read
A network switch in a rack with fibre patch cables connected.
Cloud & Infra

Singapore Has Warned About Cisco More Times in 2026 Than in Any Full Year Before It

We read all 847 CSA alerts since 2020. Cisco leads every vendor, 2026 is already the heaviest Cisco year on record, and four of the five Catalyst SD-WAN alerts ever issued are from this year.

7 Aug 2026 · 8 min read
Steel transmission tower photographed from below against a bright sky — illustrating the ten-gigawatt power commitment behind this data-centre financing.
Cloud & Infra

Nvidia Is Reported in Talks to Guarantee $250 Billion of OpenAI's Ohio Data-Centre Debt

The Wall Street Journal reports Nvidia would backstop the lease and construction financing for a 10-gigawatt campus in Pike County. OpenAI has no investment-grade rating, so the chipmaker's balance sheet would stand in for one.

29 Jul 2026 · 5 min read
A wide view of an industrial electrical substation with power lines and towers outdoors.
Cloud & Infra

Hut 8's Second Beacon Point Lease Is $9.8bn — Which Works Out at $124.74 per kW a Month, Rising to $188.68

The filing discloses the term, the escalator and the capacity but not the rent. We solved for it — and for the three different headline numbers, only two of which are contracted.

26 Jul 2026 · 6 min read
A stack of paper envelopes.
Cloud & Infra

AWS Split SES Into Three Plans — and the Dearer Ones Cost More Per Email at Every Volume

Amazon SES now has Essentials, Pro and Enterprise tiers. Pro carries a US$105 monthly fee and a higher per-email rate in every band, so no send volume makes it the cheaper way to deliver mail.

26 Jul 2026 · 4 min read
A mesmerizing close-up of water droplets and ripples, capturing dynamic motion and beauty.
Cloud & Infra

Wafr's $100M Cooling Raise Is Small — the AI Data-Centre Water Problem It Targets Is Not

Vancouver startup Wafr Technologies has raised $100 million from undisclosed private investors — toward a $300 million goal — for a thermal-battery cooling system it says can cut AI data-centre water use by up to 95% and cooling energy by up to 80%, the company announced on 3 July 2026. Those efficiency figures are Wafr's own and have not been independently validated, and the company has not announced a commercial deployment. But the problem it is chasing is real and increasingly urgent: cooling and water have become a genuine constraint on AI data-centre expansion, with a typical 100-megawatt US hyperscale facility consuming around two million litres of water a day.

9 Jul 2026 · 8 min read
iPhone displaying Facebook app icon with blurred background, emphasizing social media connectivity.
Cloud & Infra

Meta Compute: Meta Is Reportedly Exploring a Cloud Business for Excess AI Capacity

Bloomberg reports that Meta is building a cloud business, internally called Meta Compute, to sell access to excess AI infrastructure to outside customers. Reuters says Meta declined to comment, so this remains a reported plan rather than a launched product; the clearer confirmed facts are Meta's rising AI capex and CoreWeave's $21 billion AI-capacity agreement with Meta through December 2032.

6 Jul 2026 · 7 min read
The national flag of South Korea.
Cloud & Infra

Three Singapore-Based Operators Moved Into South Korea's Data-Centre Market in Two Weeks

STT GDC opened its first South Korea data centre this month, days after Keppel and Digital Edge each moved on Greater Seoul. Singapore-based operators are expanding into a market where vacancy is around 1.4% and power, not demand, is the binding constraint.

19 Jun 2026 · 6 min read
Detailed view of computer hard disk drive components, showcasing circuitry and connectors.
Cloud & Infra

Dallas Tops the World's Data-Centre Ranking — but Northern Virginia Still Has the Most Capacity

Cushman & Wakefield ranked Dallas the world's top primary data-centre market for the first time in May 2026. But Northern Virginia, at 11.3 GW operational, is still the largest by installed capacity — the shift is about pipeline and power, not inventory.

19 Jun 2026 · 6 min read
Editorial Policy →